FT-SN Firm Transportation - Short Notice

Description of Service:

  • Firm service with a primary receipt point and a primary delivery point designed to meet the needs of markets which require a flexible and firm gas supply to serve fluctuating demands with as little as 15 minutes notice (e.g. gas-fired power generation).

Key Features and Benefits:

  • Unique features include reserved capacity, flow control, requirement for separate delivery area and up to 96 nomination windows daily.

How to Access this Service:

  • Bid for service through a TC Energy held Open Season. Notices are posted on the TC Energy website and detail the capacity offered as well as the bidding process.
  • Shipper must sign an FT-SN contract for the accepted bid with TC Energy.
  • Shipper may also sign an Assignment Agreement with TC Energy and the holder of an existing FT-SN contract to take over all or a portion of that existing contract-holder’s service.

For Further Information

Contact your Marketing Representatives, or via any of the options listed below.

 

The Pipe Line: 1.403.920.PIPE (7473)
Email: customer_express@tcenergy.com

Attributes

 

 

Service Priority Firm and reserved
Renewal Rights Renewal minimum 1 year
1 years' notice required
Build TC Energy will build facilities with a minimum 15 year contract term
Service Flexibility

Diversions
Alternate Receipt Points
Temporary Receipt / Delivery Points
Assignments
Reserved capacity
Up to 96 nomination windows daily
Flow control required at delivery point
Flow rate nomination required (GJ/hr)
Separate delivery area required

Access

Open Season
Awarded based on term x toll

Term

Minimum term is 1 year

Toll

Monthly FT-SN demand toll
Current FT-SN toll is equal to 110% of the applicable FT toll

 

 

Please Note:
This service description is for informational purposes only. For more detailed descriptions, please review the Transportation Tariff which provides complete detail and supersedes the information provided on this page.

Related Information


Credit Procedures